Wenzhou lighting project construction scheme brief description

Wenzhou lighting project construction scheme brief description

发布时间:2023-03-02 14:49:46 来源:本站 点击数:0

Wenzhou lighting project construction scheme:

1. Preliminary preparation:

a. Formulate detailed construction plans, safety measures and site management regulations;

b. Complete construction site inspection and acceptance;

c. Determine material quality, including lamps, electrical appliances, cables, etc.;

d. Complete the preparatory work before the installation of electrical equipment;

2. Construction phase:

a. Wiring power lines and installing lamps;

b. Install electrical equipment;

c. Install the controller.

d. Test and debug;

3. Post-stage management:

a. Manage, maintain, check and maintain the system regularly;

b. Check the construction effect to ensure the construction quality;

c. Create files for subsequent management and maintenance.

led楼体亮化工程

During the construction of the lighting project, the following points should be noted:

1. Ensure the quality of installation materials and equipment;

2. Construction in strict accordance with the installation drawings;

3. Comply with the required safety measures;

4. Check and maintain the equipment regularly;

5. Check the construction effect to ensure the construction quality.